Wallet & Timeline Widgets

SCR-DASH-02 · Project Dashboard & Health

Scopedno Figma mapping

Layout

Combines the two Should-priority dashboard widgets — wallet & payment status (DOV-073) and timeline & holding cost (DOV-074) — that can be viewed independently of each other and of the core dashboard content in SCR-DASH-01, and never gate it. They're documented together because both are secondary, self-contained sections of the same project dashboard page rather than separate navigable destinations.

States

- **Wallet not set up**: "set up wallet" prompt in place of payment method/activity detail. - **Wallet set up**: shows connected methods, Dovel Project Card status, and recent activity. - **Timeline not set up**: "add timeline" prompt in place of schedule status. - **On schedule**: neutral/positive schedule indicator, no cost-impact callout. - **Behind schedule**: schedule indicator plus the resulting holding-cost impact. - **Loading / error**: loading state on first render; retry affordance if either widget's data fails to load.

Acceptance criteria

  • A wallet/payment widget summarizes wallet setup status: connected, not set up, or needs attention.
  • The widget shows connected payment methods and Dovel Project Card status, where applicable.
  • The widget shows the project's most recent payment activity.
  • With no wallet set up, a "set up wallet" prompt is shown; the rest of the dashboard is never blocked or broken by this.
  • Tapping the widget opens the full wallet & payments screen (FEAT-06).
  • A timeline widget shows schedule status (e.g., on schedule, behind schedule) relative to the project's planned timeline.
  • The widget shows the current holding cost impact — accrued and/or projected holding costs tied to the timeline.
  • With no timeline set up, an "add timeline" prompt is shown instead of a blank or misleading schedule status.
  • Holding costs shown here match the holding-costs section of the project's overall P&L — never a separately calculated, potentially conflicting number.
  • When the project is behind schedule, the widget shows the resulting holding-cost impact (e.g., additional days × daily holding cost), not just a generic "delayed" flag.

Powered by — endpoints · the Backend agent owns these

GET /projects/{project_id}/pnl
P
Product agent
supports Design & PM
×