DDovel Team
Figma Dovel iQ v0.3 MVP (Active) · 2026-10-10
Product / Project Dashboard & Health / Project Dashboard

Project Dashboard

SCR-DASH-01 · Project Dashboard & Health

Scopedno Figma mapping

Layout

Single screen combining the four Must-priority dashboard stories that together answer "am I on track": health status (DOV-069), estimated profit (DOV-070), budget vs. actuals (DOV-071), and attention cards / next best action (DOV-072). They're documented together because they render as one continuous, scrollable dashboard for a single project — not separate destinations — matching PRD §7.7's framing of the dashboard as a single interpreted view, not a set of standalone reports.

States

- **Default**: all four sections populated with live data. - **Incomplete setup**: each section renders its own partial "needs setup" state independently (e.g., profit shows "add exit assumptions" while budget and attention cards render normally) — the dashboard as a whole is never blocked by one incomplete section. - **Loading**: skeleton/loading state on first open. - **Error**: retry affordance if dashboard data fails to load. - **All caught up**: attention cards section shows a positive "nothing needs attention" state instead of an empty gap.

Acceptance criteria

  • A health status badge — "On track", "Needs review", or "At risk" — renders at the top of the screen before any other detail.
  • Health status reflects live budget, timeline, missing-data, and insight-severity signals, matching the same status shown for this project on Portfolio Home (FEAT-02 DOV-062).
  • With incomplete project setup, the screen still renders with a "Needs review" status and an explanation of what's missing, never an error or blank screen.
  • While dashboard data is loading, a loading state is shown rather than a blank screen.
  • If dashboard data fails to load, an error with a retry action is shown.
  • Expanding the health status shows a plain-English reason for the current status.
  • A single current estimated profit figure is shown for the project.
  • Estimated profit is calculated from the full acquisition + renovation + holding cost basis plus exit assumptions, never from renovation spend alone.
  • Inputs feeding the estimate are labelled as actual (confirmed) versus estimated/projected.
  • With no exit assumptions set, an explicit "add exit assumptions to estimate profit" state is shown instead of a misleading $0 or blank figure.
  • With no financing/funding costs set up, the estimate explicitly flags that gap rather than silently omitting funding costs.
  • Estimated profit recalculates automatically when budget, actuals, or exit assumptions change.
  • Overall expected (budget) spend vs. actual spend to date is shown.
  • Expected vs. actual spend is broken down by category/scope.
  • Categories running over budget are visually distinguished from categories on or under budget.
  • Budgeted, actual, and projected-to-complete figures are always visually distinct, never merged into one ambiguous number.
  • With no budget set, this section shows a "no budget set" state with a link into budget setup, rather than $0 actual with no context.
  • Tapping a category opens that category's underlying transactions or budget detail.
  • Attention cards surface missing reviews, uncategorised transactions, overspend, missing documents, and overdue actions, whichever apply.
  • Attention cards are ordered so the single next best action appears first.
  • Tapping a card navigates directly to the exact underlying transaction, document, or budget category screen.
  • With nothing needing attention, a clear "all caught up" state is shown instead of an empty gap.
  • Resolving the underlying issue removes or updates the corresponding card without a manual dashboard refresh.

Powered by — endpoints · the Backend agent owns these

GET /projects/{project_id}/pnl
P
Product agent
supports Design & PM
×