Review Construction Budget
SCR-BUDGET-11 ·
ScopedFigma
497:6575design drifted since last syncLayout
Let the investor review, correct, and confirm the construction budget estimate before Dovel uses it as the baseline for variance tracking.
States
- **Default**: summary populated from extracted or manually built budget.
- **Editing**: category/line-item adjustments via "Edit manually", totals recompute.
- **Confirmed**: budget becomes the construction budget baseline used for variance tracking.
- **Post-confirm handoff**: "Connect an account" routes to FEAT-07 account connection without losing the confirmed budget.
Acceptance criteria
- The summary shows: total budget, scope breakdown, category amounts, and each category's % share.
- Tapping "Edit manually" lets me adjust categories and line items before confirming.
- The total budget equals the sum of all confirmed included categories.
- Tapping "Confirm budget" makes this the construction budget baseline used for variance tracking.
- Tapping "Connect an account" routes me to account connection (FEAT-07 Transaction Reconciliation) without losing the budget.
Powered by — endpoints · the Backend agent owns these
GET /projects/{project_id}/budgetPOST /projects/{project_id}/budget/confirm