Project feedback
Project feedback · Figma 7255:8578
Scopednot in the frontend yetFigma
7255:8578Frontend
No matching Flutter page yet — not built.
Endpoints this screen calls · 1 endpoints, 0 confirmed in code · the Backend agent owns these
POST /projects/{project_id}/closure/feedback
Acceptance criteria · drafted by Product agent
- User can select or enter feedback on which Dovel iQ features they want built (e.g. feature options, priority, and optional comments).
- System validates required feedback inputs before submission and displays inline error messages if validation fails.
- On submit, the app calls POST /projects/{project_id}/closure/feedback with the user's selections and shows a loading state until a response is received.
- On successful submission, the user is navigated to the iQ-feedback/success screen; on failure, an error message is shown and the user's input is preserved.
What's on the screen
—