DDovel Team
Figma Dovel iQ v0.3 MVP (Active) · 2026-10-10
Flows / Guided Full Project Setup / reconciliations/upload/analyzing

reconciliations/upload/analyzing

reconciliations/upload/analyzing · Figma 519:8741

reconciliations/upload/analyzing
Scopedready for devnot in the frontend yetFigma 519:87412 design states

Frontend

No matching Flutter page yet — not built.

Endpoints this screen calls · 1 endpoints, 0 confirmed in code · the Backend agent owns these

POST /projects/{project_id}/transactions/csv-import/{media_item_id}/analyze

Acceptance criteria · drafted by Product agent

  • On entry, the app calls POST /projects/{project_id}/transactions/csv-import/{media_item_id}/analyze to analyze the imported CSV/statement.
  • System shows an analyzing progress state and disables interaction until analysis completes.
  • On success, the user is routed to review/categorize the extracted transactions (screen 32); on failure, the user can retry or re-upload.

What's on the screen

—
P
Product agent
supports Design & PM
×