DDovel Team
Figma Dovel iQ v0.3 MVP (Active) · 2026-10-10
Flows / Guided Full Project Setup / build-scope/credit-line/upload

build-scope/credit-line/upload

build-scope/credit-line/upload · Figma 483:7319

build-scope/credit-line/upload
Scopedready for devnot in the frontend yetFigma 483:7319

Frontend

No matching Flutter page yet — not built.

Endpoints this screen calls · 2 endpoints, 0 confirmed in code · the Backend agent owns these

POST /projects/{project_id}/budget/documentPOST /projects/{project_id}/budget/document/upload-and-analyse

Acceptance criteria · drafted by Product agent

  • User can upload a scope/budget document; the app calls POST /projects/{project_id}/budget/document to attach it and POST /projects/{project_id}/budget/document/upload-and-analyse to analyze it.
  • System displays an analyzing state and disables submission until analysis completes.
  • On success, extracted budget data flows into the scope breakdown review (screen 23); on failure, the user can retry or enter the budget manually.

What's on the screen

—
P
Product agent
supports Design & PM
×