DDovel Team
Figma Dovel iQ v0.3 MVP (Active) · 2026-10-10
Flows / Guided Full Project Setup / edit-extracted-data

edit-extracted-data

edit-extracted-data · Figma 412:5642

edit-extracted-data
Scopedready for devnot in the frontend yetFigma 412:5642

Frontend

No matching Flutter page yet — not built.

Endpoints this screen calls · 2 endpoints, 0 confirmed in code · the Backend agent owns these

POST /projects/{project_id}/budget/document/{media_item_id}/confirmPATCH /projects/{project_id}/budget/items/{item_id}

Acceptance criteria · drafted by Product agent

  • On load, the app displays the data extracted from the scope document for user review and correction.
  • User can edit any extracted budget line item; each edit calls PATCH /projects/{project_id}/budget/items/{item_id} and reflects the change immediately.
  • User can confirm the extracted data; on confirm the app calls POST /projects/{project_id}/budget/document/{media_item_id}/confirm and advances the flow.
  • System prevents confirmation while required extracted fields are empty or invalid.

What's on the screen

—
P
Product agent
supports Design & PM
×