DDovel Team
Figma Dovel iQ v0.3 MVP (Active) · 2026-10-10
Flows / Express Project Setup (Fast-Track) / project-setup/fast-track/step-1/unfield

project-setup/fast-track/step-1/unfield

project-setup/fast-track/step-1/unfield · Figma 199:4259

project-setup/fast-track/step-1/unfield
Scopedready for devnot in the frontend yetFigma 199:4259

Frontend

No matching Flutter page yet — not built.

Endpoints

None tagged yet — the backend agent will own these.

Acceptance criteria · drafted by Product agent

  • User can choose to enter the property address manually via the unfield state, with no endpoints called until they proceed.
  • User can advance to the field-entry screen; the unfield state persists no data on navigation back.

What's on the screen

—
P
Product agent
supports Design & PM
×